K Rouse completed works for Taylor Woodrow on the Nottingham Express Transit (NET) Phase 2, to the south of Nottingham.
Our works included the installation of 900m of new box culverts with internal sizes of between 1200mm x 1800mm and 1500mm x 3600mm at depths from 2.0m to 4.5m to invert.
The route of the box culverts included the online replacement of existing sections, two road crossings and a point of restricted access of less than 10m between residential buildings.